- ERCOT
- The Electric Reliability Council of Texas. It operates the power grid that carries about 90 percent of the state's electric load and manages requests from large new users to connect.
- PUCT
- The Public Utility Commission of Texas. The state agency that regulates electric utilities and approves the routes of new transmission lines.
- Transmission line
- A high-voltage line that moves power in bulk between power plants and substations. In Texas these usually run at 69 kV, 138 kV or 345 kV. They are different from the lower-voltage distribution lines that run along most roads.
- Substation
- A fenced facility where lines meet and voltage is stepped up or down. A data center takes its power from a substation, so distance to a substation matters more than distance to a line.
- Switching station
- A facility that connects transmission lines to each other without changing the voltage.
- Kilovolt (kV)
- One thousand volts. The higher the voltage of a line, the more power it can carry.
- 138 kV
- The regional transmission voltage found across most Texas counties. It is the practical minimum for a data center site.
- 345 kV
- The high-capacity backbone of the Texas grid. Land near a 345 kV line or substation is the most sought after for large data center campuses.
- Megawatt (MW)
- A unit of power. The size of a data center is measured in megawatts of electric load, not in square feet.
- Large load
- A single customer that draws a very large amount of power, such as a data center. Texas Senate Bill 6, passed in 2025, set interconnection rules for loads of 75 MW or more.
- Interconnection
- The process of getting the utility and ERCOT to study, approve and build a new connection to the grid. It is often the longest part of a data center project.
- Capacity
- How much new load a substation or line can accept without upgrades, sometimes called headroom. Most Texas substations have little to spare, which is why we check capacity before anything else.
- Transmission service provider
- The utility that owns and operates the transmission lines in an area. In Texas these include Oncor, CenterPoint Energy, AEP Texas, TNMP and LCRA.
- Entergy Texas
- The utility that serves much of Southeast Texas. Its territory sits outside ERCOT and is part of the MISO grid.
- Electric cooperative
- A member-owned utility that serves many rural parts of Texas. Which utility holds the retail service territory can affect how a large customer gets power.
- CCN
- A Certificate of Convenience and Necessity. A utility needs one from the PUCT before building a new transmission line, and CCNs also define the service territories of electric and water utilities.
- Easement
- A recorded right for someone else to use part of your land for a specific purpose, such as a power line. You still own the land.
- Right-of-way
- The strip of land that an easement covers.
- Condemnation
- Also called eminent domain. The legal process a utility with that authority can use to acquire an easement when no agreement is reached. The owner is entitled to compensation.
- Option agreement
- A contract that gives a buyer the exclusive right to purchase land at an agreed price within a set period, in exchange for a payment to the owner.
- Option period
- The time the buyer has to study the land and decide whether to close. We use it for grid, title and site diligence.
- Due diligence
- The checks a buyer runs before closing, such as title, survey, floodplain, environmental and utilities.
- Title commitment
- A title company's report on who owns the land and which liens, easements and restrictions are recorded against it.
- Floodplain
- Land that FEMA maps as likely to flood. For a data center, the buildable acreage outside the floodplain is what counts.
- Mineral rights
- Ownership of the oil, gas and minerals beneath the land. In Texas these are often owned separately from the surface.
- Assemblage
- Combining neighboring parcels into one larger site.
- Data center
- A building that houses computer servers. It needs a large, reliable supply of power, which is why it is sited by the grid first and the land second.